Pre-Power-Up Checklist for Control Panels

Complete these checks before energizing a control panel or machine for the first time. Follow your site's procedures and the manufacturers' instructions. Ticks and notes are saved on this device.

1. Safe work

2. Inspection

3. Terminations and wiring

4. Grounding

5. Tests with the power off

6. Supply and settings

7. Energize

8. After energizing

Notes and punch list